百度网盘 泰国橙线地铁项目资料

file:泰国曼谷橙线地铁项目招标文件(翻译版).zip file:Thailand_MRT_Orange_Line_.pptx file:VOLUME 2-PART 3 Maintenance Services Proposal.docx file:Table of Contents-Maintenance.docx file:Appendix 4_Reference for Maintenance Services.docx file:Appendix 3 Depot & Workshop Facilities and Tools List.docx file:Appendix 2 List of maintenance and training documents of RST.docx file:Appendix 10 Training Plan - Rolling Stock Maintenance.docx file:Chapter 3 Depot Equipment.docx file:Chapter 2 Underfloor Wheel Lathe.docx file:Appendix 9_Testing and Commissioning Plan.docx file:Appendix 8_DEPOT & WORKSHOP FACILITIES MAINTENANCE.docx file:Appendix 7_PRELIMINARY WORKS PROGRAMME.doc file:Appendix 5_List of Standards.docx file:Appendix 3_LIST OF NON-COMPLIANCE AND JUSTIFICATION FOR EMPLOYER'S REQUIREMENTS.docx file:Appendix 2_MRTA's Requirement Compliance Matrix.docx file:Appendix 1_STATEMENT OF COMPLIANCE FOR PARTICULAR SPECIFICATIONS.docx file:Chapter 4 Bogies.docx file:Annex 4-1 Technical Proposal of Passive Obstacle Detection Device.docx file:CHAPTER 13 CAB.docx file:Chapter 12 Vehicle Interior.docx file:Annex_11-1_PASSENGER_DOOR_SYSTEM_DESCRIPTION.doc file:Chapter_1_Train_Performance20220618.doc file:Annex_1-1 GENERAL TECHNICAL SCHEME OF GOA 4 TRAIN.docx file:Appendix 14_Safety and health Plan.docx file:Appendix 12_Environmental Mitigation & Protection Plan.docx file:Chapter 9 Safety and Protection System.docx file:Chapter 8 On-board Train Communications.doc file:Chapter 7 CONTROL AND MONITORING SYSTEM.docx file:Chapter 6 Auxiliary Electrical Equipment.docx file:Annex 6-5 Technical Proposal of Lighting System-updated.docx file:Annex 6-3 Battery Capacity Calculation.docx

午夜***失眠
百度网盘
2020-01-03 17:00:58

最新资源

  • 2025小红书直播避坑手册|违禁词 违规问题大全(直播运营资料+免费下载)
  • 《西游谜局》高清PDF|神话解析+神魔智斗(独家解读+惊天真相)
  • Pua 醒与悟
  • 情感社 - 强者内核 - 【两xing关系】中的通关秘籍(2)
  • 《大宋败家子:开局老婆被典卖》主播:六零一听书 1403集完(1)
  • 紧致之升级版脏腑扶阳全集精讲课程(1)
  • 2025年《53中考总复习》7科全套(全国版)(1)
  • 小学奥数数学思维训练1-6年级网校教学动画视频教程【高斯数学】(2)
  • 炳祥八字命理全阶课|从入门到精通(初级+中级班合集+命盘解析实战)
  • 量化投资 视频课